Articulo de referencia

Línea 1 (Sound Transit)

Mapa de ruta : "},"ridership2":{"wt":"35,564,496 (2025) "},"website":{"wt":"{{URL|https://www.soundtransit.org/schedules/link-light-rail|soundtransit.org}}"},"open":{"wt":"{{Sta...

Mapa de ruta :

La Línea 1  , anteriormente conocida como Central Link , es una línea de tren ligero en Seattle , Washington, Estados Unidos, y forma parte del sistema de tren ligero Link de Sound Transit . Presta servicio a 26 estaciones en los condados de King y Snohomish , recorriendo 66 km (41 millas ) entre las estaciones de Lynnwood City Center y Federal Way Downtown . La línea conecta Lynnwood , Mountlake Terrace , Shoreline , el Distrito Universitario , el centro de Seattle , el Valle de Rainier , el Aeropuerto Internacional de Seattle-Tacoma , Kent , Des Moines y Federal Way . La Línea 1 transportó más de 35,5 millones de pasajeros en total en 2025, con un promedio de casi 103 000 pasajeros diarios entre semana. Opera durante 20 horas al día entre semana y los sábados, con intervalos de tan solo seis minutos durante las horas pico , y un servicio reducido de 18 horas los domingos y festivos.   

Los trenes suelen estar compuestos por tres o cuatro vagones, cada uno con capacidad para 194 pasajeros (74 sentados), además de sillas de ruedas y bicicletas. El pago se realiza mediante la tarjeta regional ORCA , billetes de papel o una aplicación móvil. Sound Transit utiliza comprobantes de pago para verificar las tarifas, empleando agentes de control de tarifas y policía de tránsito para realizar inspecciones aleatorias. Hasta agosto de 2024, las tarifas se calculaban en función de la distancia recorrida. Todas las estaciones cuentan con máquinas expendedoras de billetes , arte público , aparcamiento para bicicletas y conexiones de autobús, y varias también disponen de aparcamientos disuasorios . Las estaciones entre Lynnwood y Seattle se comparten con la Línea 2  , que da servicio a la región de Eastside del condado de King .

Los votantes aprobaron Central Link en una consulta popular en 1996 y la construcción comenzó en 2003, luego de que el proyecto se reorganizara bajo un nuevo presupuesto y una ruta acortada en respuesta a costos más altos de lo esperado. La línea de tren ligero, que llegó después de décadas de planes de transporte fallidos para la región de Seattle, se inauguró el 18 de julio de 2009, terminando en Westlake en el Túnel de Tránsito del Centro de Seattle y Tukwila International Boulevard cerca del Aeropuerto Sea-Tac. Se extendió hacia el sur hasta SeaTac/Aeropuerto en diciembre de 2009, hacia el norte hasta la Universidad de Washington en marzo de 2016 y hacia el sur hasta Angle Lake en septiembre de 2016. La línea fue renombrada temporalmente como Línea Roja hasta que su designación cambió a  Línea 1 en 2021, coincidiendo con una extensión a Northgate.

La primera extensión que cruza el condado, hacia el norte hasta Lynnwood, se inauguró en agosto de 2024; le siguió una extensión hacia el sur hasta Federal Way que se inauguró en diciembre de 2025. La  Línea 2 comenzó a prestar servicio compartido con la  Línea 1 entre Lynnwood y el centro de Seattle en febrero de 2026 y se inauguró por completo un mes después. Se planea una mayor expansión bajo Sound Transit 3 para dividir el corredor actual entre dos líneas: la  Línea 1 desde Ballard (a través de la Extensión Ballard Link ) hasta Tacoma y la Línea 3  desde Everett hasta West Seattle .

Historia

Antecedentes y propuestas iniciales de transporte público

Un tren con dos vagones que pasa por el centro de la ciudad, en vías incrustadas en la calle.
Un tren interurbano del ferrocarril eléctrico Puget Sound con destino a Tacoma , visto en la década de 1920.

El servicio de transporte público en Seattle comenzó en 1884 con la introducción de la primera línea de tranvía tirado por caballos de la ciudad . El sistema fue reemplazado por una red de tranvías eléctricos y tranvías de cable a finales de la década, lo que impulsó el desarrollo de nuevos suburbios de tranvía en lo que hoy es Seattle. [ 2 ] [ 3 ] Los ferrocarriles interurbanos a Everett , Tacoma y el Valle de Rainier se establecieron después del cambio de siglo, lo que proporcionó a la región un sistema ferroviario de pasajeros interurbano para alimentar las líneas de tranvía. [ 4 ] El sistema interurbano no pudo competir con la creciente popularidad de los viajes en automóvil, culminada con la finalización de la Ruta 99 de los Estados Unidos a finales de la década de 1920, y fue clausurado. [ 5 ] Para 1941, los tranvías también habían sido adquiridos por el gobierno municipal y reemplazados por una red de trolebuses . [ 3 ] [ 6 ]

Varias propuestas para un sistema de transporte rápido en Seattle, para reemplazar las redes de tranvías —y luego autobuses—, fueron presentadas en el siglo XX y rechazadas por funcionarios de la ciudad o votantes debido a su costo u otros factores. En 1911, el planificador urbano Virgil Bogue propuso un sistema de 41 millas (66 km) de túneles de metro y ferrocarriles elevados como pieza central de un plan integral para la ciudad, que fue rechazado por los votantes. [ 7 ] El monorraíl del Seattle Center , construido originalmente para la Feria Mundial de 1962 , ha sido objeto de varias propuestas de expansión fallidas respaldadas por el gobernador Albert Rosellini en la década de 1960 y los votantes de Seattle a principios de la década de 2000. [ 8 ] El Comité Forward Thrust de finales de la década de 1960 propuso un sistema de transporte rápido de 47 millas (76 km) , para conectar el centro de Seattle con Ballard , el Distrito Universitario , Lake City , Capitol Hill , Bellevue y Renton . El gobierno federal ofreció financiar dos tercios de los costos de capital del sistema ferroviario, aproximadamente $770 millones (equivalente a $ 5.29 mil millones en dólares de 2024 ), [ 9 ] si los votantes aprobaban $385 millones (equivalente a $ 2.64 mil millones en dólares de 2024 ) [ 9 ] en impuestos locales sobre la propiedad. [ 10 ] La iniciativa de tránsito rápido se incluyó en la boleta electoral en febrero de 1968, pero no alcanzó la supermayoría necesaria para su aprobación. Un segundo intento en mayo de 1970, con $440 millones (equivalente a $ 2.73 mil millones en dólares de 2024 ) [ 9 ] en financiamiento local y $870 millones (equivalente a $ 5.41 mil millones en dólares de 2024 ) [ 9 ] en financiamiento federal, [ 11 ] fracasó en medio de una recesión económica local causada por los despidos en Boeing . [ 12 ] Los fondos federales destinados al sistema de transporte rápido se otorgaron a Atlanta, Georgia , formando así la financiación inicial para el          Sistema ferroviario de la Autoridad de Tránsito Rápido Metropolitano de Atlanta . [ 13 ]

Planificación del tren ligero

Tras el fracaso de las iniciativas Forward Thrust, Metro Transit se creó en 1972 para supervisar una red de autobuses en todo el condado y planificar un futuro sistema ferroviario. [ 14 ] A principios de la década de 1980, Metro Transit y el Consejo de Gobiernos de Puget Sound (PSCOG) exploraron conceptos de tren ligero y vías exclusivas para autobuses para servir a la región, [ 15 ] optando finalmente por construir un túnel de transporte en el centro que sería convertible de autobuses a tren ligero en una fecha posterior. [ 16 ] El PSCOG respaldó formalmente un plan de tren ligero en 1986, recomendando que se construyera un sistema para 2020, e incluir una línea entre Seattle y el aeropuerto Sea-Tac , [ 17 ] con alternativas de ruta que servían al valle de Rainier. [ 18 ] [ 19 ] En 1988 se aprobó una medida consultiva sobre la planificación del tren ligero en el condado de King , que instaba a Metro Transit a acelerar el cronograma del plan para que se inaugurara en el año 2000. [ 20 ] En 1990, la legislatura estatal respaldó la creación de una junta de transporte regional compuesta por políticos de los condados de King, Pierce y Snohomish , con el objetivo de implementar el plan de transporte regional. [ 21 ] Varios miembros del Ayuntamiento de Seattle respaldaron el plan ferroviario con la condición de que pasara por el valle de Rainier, que para entonces era un barrio económicamente desfavorecido y de mayoría minoritaria. [ 22 ]

La Autoridad Regional de Tránsito de Central Puget Sound, posteriormente renombrada Sound Transit , fue creada en 1993 para redactar y presentar un plan de tránsito regional para su aprobación por los votantes. [ 23 ] La agencia propuso una red de tren ligero de 70 millas (110 km) como pieza central de una medida electoral de tránsito de $6.7 mil millones, con una línea de superficie a través del Valle de Rainier y túneles entre el centro de Seattle, Capitol Hill y el Distrito Universitario. [ 24 ] [ 25 ] La medida electoral no fue aprobada el 14 de marzo de 1995, [ 26 ] y la línea de tren ligero se acortó a 25 millas (40 km) , entre el Distrito Universitario y el Aeropuerto Sea-Tac. [ 27 ] Los votantes aprobaron el paquete de $3.9 mil millones el 5 de noviembre de 1996, junto con aumentos en los impuestos sobre las ventas y los impuestos especiales sobre vehículos motorizados en todo el distrito de tránsito regional. [ 27 ] [ 28 ] Sound Transit consideró varias opciones de ruta durante una serie de audiencias públicas y estudios al inicio del estudio de impacto ambiental del proyecto, [ 29 ] que adoptó el nombre de "Central Link". [ 30 ] En 1999, Sound Transit seleccionó el trazado para el proyecto del tren ligero, que consiste en una línea entre el Distrito Universitario y el Aeropuerto Sea-Tac, con segmentos de superficie que pasan por Tukwila , el Valle Rainier y SoDo , y túneles bajo Beacon Hill , First Hill , Capitol Hill y Portage Bay . [ 31 ]    

Problemas y retrasos presupuestarios

El proyecto Central Link se planeó originalmente para abrir en 2006 y se proyectó que costaría $1.9  mil millones (equivalente a $ 3.5 mil millones en dólares de 2024 ), [ 9 ] pero los auditores encontraron que las estimaciones eran poco realistas en noviembre de 2000. [ 32 ] Nuevos ejecutivos, contratados por Sound Transit para reemplazar a los directores de programa anteriores, presentaron un plan revisado con una fecha de apertura pospuesta tres años a 2009 y una estimación de costo de $3.8 mil millones (equivalente a $ 6.56 mil millones en dólares de 2024 ). [ 9 ] [ 33 ] La planificación del túnel de Portage Bay entre Capitol Hill y el Distrito Universitario se suspendió debido a ofertas de contratistas más altas de lo esperado, atribuidas a difíciles condiciones del suelo. [ 34 ] Sound Transit adoptó el presupuesto y cronograma revisados ​​en enero de 2001, incluyendo disposiciones para volver a estudiar las opciones de ruta entre el centro de Seattle y el Distrito Universitario, junto con un acuerdo de subvención federal de $500 millones para financiar la construcción de un "segmento inicial" para el proyecto. [ 35 ] [ 36 ] El segmento inicial identificado y aprobado por Sound Transit ese mismo año acortó la línea a 14 millas (23 km) , entre el centro de Seattle y una estación al sur de Tukwila cerca del aeropuerto Sea-Tac. Las rutas restantes hacia el aeropuerto y el Distrito Universitario fueron devueltas a la etapa de planificación y reorganizadas en proyectos de tren ligero separados. [ 37 ] [ 38 ]     

En noviembre de 2001, Sound Transit aprobó la construcción del proyecto de tren ligero Central Link acortado, con la colocación de la primera piedra prevista para el verano de 2002. [ 39 ] La adquisición de terrenos en el valle de Rainier comenzó en marzo de 2002, [ 40 ] pero dos batallas legales retrasaron el inicio de la construcción. En noviembre de 2002, el Tribunal Superior del Condado de King falló a favor de Sound Transit en una demanda presentada por opositores al tren ligero, alegando que carecía de autoridad para acortar una línea aprobada por los votantes. [ 41 ] La aprobación de la Iniciativa 776 de Tim Eyman amenazaba con derogar los impuestos especiales sobre vehículos motorizados necesarios para financiar el presupuesto de Sound Transit, pero fue declarada inconstitucional en febrero de 2003. [ 42 ] Otro cambio de ruta solicitado por la ciudad de Tukwila, que colocaba las vías del tren ligero a lo largo de las autopistas en lugar de International Boulevard, fue aprobado por Sound Transit y la Administración Federal de Tránsito en 2002, acercando el proyecto a la construcción. [ 43 ]

Construcción y pruebas

Un edificio sin terminar rodeado por un terreno baldío cercado.
El edificio principal de la estación de Beacon Hill , visto en construcción en mayo de 2009.

Sound Transit recibió su  acuerdo de subvención federal de 500 millones de dólares en octubre de 2003, [ 44 ] y se celebró una ceremonia de colocación de la primera piedra en SoDo el 8 de noviembre de 2003. [ 45 ] Los contratos de construcción para varios segmentos se adjudicaron en 2004 y 2005, quedando un seis por ciento por debajo de las estimaciones de Sound Transit, [ 46 ] y comenzaron los trabajos en todas las partes del sistema. [ 47 ] [ 48 ] La construcción del puente sobre el río Duwamish en Tukwila se retrasó por el descubrimiento de más de 900 artefactos indígenas Coast Salish en febrero de 2005; los trabajos se detuvieron para una excavación y examen de seis semanas por parte de arqueólogos, incluyendo de la tribu Muckleshoot . [ 49 ] Los primeros rieles se instalaron el 18 de agosto de 2005, en el área de SoDo; [ 46 ] un mes después, el túnel de tránsito del centro cerró para una renovación de dos años para dar cabida al servicio de tren ligero. [ 50 ] La excavación del túnel y la estación de Beacon Hill comenzó en 2005, y a principios de 2006 se pusieron en marcha dos tuneladoras para perforar los túneles gemelos entre SoDo y Rainier Valley. [ 51 ]

Las estaciones SODO y Stadium se completaron en mayo de 2006, [ 52 ] y las pruebas del tren ligero en el área de SoDo comenzaron en marzo siguiente. [ 53 ] Las pruebas se extendieron al túnel de tránsito del centro reabierto en septiembre de 2007, inicialmente limitado a los fines de semana sin servicio de autobús, [ 54 ] y más al Valle de Rainier después de la finalización del túnel de Beacon Hill en 2008. [ 55 ] [ 56 ] La vía elevada en Tukwila, incluidos los cruces sobre las principales autopistas y el río Duwamish , se completó en 2007 después de la instalación de 2457 segmentos de hormigón prefabricado y puentes de voladizo equilibrados . [ 57 ] Durante la construcción en el Valle de Rainier, Sound Transit y la ciudad de Seattle ofrecieron 50  millones de dólares en fondos de mitigación y oportunidades de desarrollo a las empresas afectadas. [ 58 ] La construcción del tren ligero a lo largo de Martin Luther King Jr. Way South también dio como resultado que las líneas de servicios públicos se trasladaran bajo tierra, se mejoraran las aceras, los cruces de calles y el paisajismo. [ 59 ]

Inauguración y primeras ampliaciones

El puente alto que se encuentra aquí cruza el río Duwamish en Tukwila; el puente bajo lleva la East Marginal Way S.

Central Link se inauguró el 18 de julio de 2009 con una celebración comunitaria que atrajo a más de 92 000 pasajeros durante el primer fin de semana de servicio gratuito. [ 60 ] Los trenes comenzaron a operar en el segmento de 13,9 millas (22,4 km) entre las estaciones de Westlake y Tukwila International Boulevard , [ 61 ] junto con un servicio de autobús lanzadera para servir al aeropuerto Sea-Tac desde Tukwila. [ 62 ] La extensión de 1,7 millas (2,7 km) hasta la estación SeaTac/Aeropuerto se inauguró el 19 de diciembre de 2009, reemplazando el servicio de autobús lanzadera y otros servicios de autobús al aeropuerto. [ 63 ] Sound Transit agregó equipos de lubricación y alfombras de goma a segmentos en Tukwila y Rainier Valley en 2010 para reducir los niveles de ruido que habían alcanzado hasta 83 decibelios , superando los estándares federales de seguridad y provocando quejas por ruido de los residentes cercanos. [ 64 ] Una disputa contractual con el contratista de construcción de Rainier Valley se resolvió en 2011, lo que redujo el precio total del proyecto a 117 millones de dólares por debajo del presupuesto de 2440 millones de dólares . [ 65 ] La apertura del servicio de tren ligero a Rainier Valley impulsó un nuevo desarrollo orientado al transporte público , que inicialmente se había estancado durante la Gran Recesión , pero se recuperó a mediados de la década de 2010. [ 66 ] [ 67 ]    

El servicio de trenes Central Link aumentó su frecuencia a 6 minutos durante las horas pico, desde 7,5 minutos, en 2015 para prepararse para la apertura de la extensión University Link . [ 68 ] La línea se extendió hacia el norte hasta la estación University of Washington , vía la estación Capitol Hill , el 19 de marzo de 2016, a través de un túnel de 3,15 millas (5,07 km)  con un costo de 1.800 millones de dólares. [ 69 ] La extensión se abrió seis meses antes de su fecha programada, y las celebraciones de apertura atrajeron a 67.000 personas durante el primer día de servicio. Sound Transit desplegó trenes de tren ligero adicionales de tres vagones para hacer frente al mayor número de pasajeros después de la apertura de la extensión. [ 70 ] La línea se extendió 1,6 millas (2,6 km) hacia el sur desde el aeropuerto Sea-Tac hasta la estación Angle Lake el 24 de septiembre de 2016, incluyendo la apertura de un estacionamiento disuasorio con 1.120 plazas . [ 71 ]  

Las escaleras mecánicas de las estaciones Capitol Hill y University of Washington sufrieron varias averías y paradas importantes en los dos años transcurridos desde la apertura de la extensión University Link. Estas averías se atribuyeron a la instalación de escaleras mecánicas comerciales estándar en lugar de escaleras mecánicas más resistentes diseñadas para estaciones de transporte público. Se seleccionó a un nuevo contratista de escaleras mecánicas para realizar el mantenimiento preventivo en lugar del plan de sustitución propuesto; también se abrieron nuevas escaleras y pasillos de conexión para permitir el acceso alternativo. [ 72 ] [ 73 ] El tramo de Tukwila de la línea se cerró durante un fin de semana de octubre de 2018 para realizar reparaciones importantes después de que se descubrieran grietas en los raíles del puente de 370 m (1200 pies) que cruza la Interestatal 5. [ 74 ] 

Cambio de nombre y ampliación de Northgate

Central Link pasó a llamarse "Línea Roja" como parte de un cambio de marca de todo el sistema en septiembre de 2019 por parte de Sound Transit para prepararse para la llegada de East Link (la Línea Azul). [ 75 ] Dos meses después, la agencia anunció que consideraría un nuevo nombre tras las quejas debido a la similitud de "Línea Roja" con la discriminación racial en el acceso a la vivienda , que históricamente afectó a los residentes del Valle de Rainier. [ 76 ] Una nueva designación, la Línea 1  (de color verde), fue anunciada en abril de 2020 y entró en vigor en septiembre de 2021. [ 77 ] [ 78 ]

En enero de 2020, Sound Transit inició un proyecto de construcción de diez semanas llamado "Connect 2020" que requirió que los trenes circularan por una sola vía en el Túnel de Tránsito del Centro de Seattle. El cierre de las vías para el trabajo en la Extensión del Enlace Este donde se une con las vías existentes en el Distrito Internacional/Chinatown hizo necesaria la construcción de una plataforma central temporal en Pioneer Square para uso de los pasajeros que viajaban en tránsito. Sound Transit desplegó trenes de cuatro vagones que circulaban cada 13 a 15 minutos e implementó restricciones para transportar ciclistas en los trenes que pasaban por el centro. [ 79 ] [ 80 ] El proyecto se completó a finales de marzo después de una semana de retraso en las pruebas, pero las restricciones de frecuencia se mantuvieron debido a la pandemia de COVID-19 y los cierres locales. [ 81 ] [ 82 ] El servicio se redujo a cada 30 minutos en abril y se restableció parcialmente en septiembre a cada 8 minutos durante las horas pico y 15 minutos durante la mayoría de las demás horas. [ 83 ] [ 84 ] El primero de los nuevos  vehículos de tren ligero "Serie 2", basado en el Siemens S700 , entró en servicio en mayo de 2021. [ 85 ]

La tercera expansión de la  Línea 1, una extensión norte de 6,9 ​​km (4,3 millas ) desde la estación de la Universidad de Washington hasta el barrio de Northgate en Seattle, fue financiada por la medida electoral Sound Transit 2 en 2008 y comenzó su construcción en 2012. [ 86 ] El túnel de 5,6 km (3,5 millas ) fue excavado entre julio de 2014 y septiembre de 2016 utilizando dos tuneladoras, creando un par de túneles entre las tres estaciones de la extensión. [ 87 ] La sección más al sur de la extensión pasa por debajo del campus de la Universidad de Washington y requirió varias medidas de mitigación para reducir la interferencia electromagnética para los equipos de laboratorio, incluidos amortiguadores de goma en losas flotantes de vía y la reubicación de equipos sensibles en cuatro instalaciones. [ 88 ] La extensión de Northgate se inauguró el 2 de octubre de 2021, añadiendo tres estaciones al extremo norte de la línea. [ 89 ]  

El servicio en la  Línea 1 se vio interrumpido varias veces en 2022 y 2023 por reparaciones de emergencia y proyectos de mantenimiento que requirieron cierres de secciones y vía única con frecuencias reducidas. La tira táctil en el borde de los andenes en varias estaciones en Rainier Valley fue reemplazada luego de que se descubrió desgaste prematuro y grietas. [ 90 ] El 27 de abril de 2023, el techo de la estación Westlake fue perforado durante la construcción de la superficie y requirió dos semanas de interrupciones del servicio en el centro de Seattle, incluyendo un transbordo forzoso en la estación Pioneer Square. [ 91 ] [ 92 ] Un cruce a nivel en Royal Brougham Way (adyacente a la estación Stadium) fue reemplazado en agosto de 2023 debido al asentamiento del terreno que había hecho que se hundiera 3 pulgadas (7,6 cm) . [ 93 ] El proyecto requirió que los trenes circularan por vía única y con retrasos extensos, que continuaron durante los trabajos en las estaciones Othello y Rainier Beach que duraron hasta mediados de septiembre. [ 94 ] [ 95 ] 

expansión suburbana

Un grupo de personas se encuentra detrás de una cinta ancha que dice "Línea 1 a Lynnwood [imagen de un tren] 30 de agosto de 2024", con globos al fondo. Dos personas se preparan para cortar la cinta con unas tijeras gigantes.
Ceremonia de inauguración de la ampliación de Lynnwood Link el 30 de agosto de 2024.

La extensión Lynnwood Link se inauguró el 30 de agosto de 2024, añadiendo cuatro estaciones a la línea al cruzar al condado de Snohomish  . La construcción de la extensión de 8,5 millas (13,7 km) costó 3.000 millones de dólares y se espera que transporte 50.000 pasajeros diarios. [ 96 ] Ese mismo día, la estación University Street pasó a llamarse Symphony para reducir la confusión con las estaciones que dan servicio al campus de la Universidad de Washington. [ 97 ] Una extensión hacia el sur hasta la estación Federal Way Downtown se inauguró el 6 de diciembre de 2025. Comprende 7,8 millas (12,6 km) de vía e incluye dos paradas intermedias; el proyecto, denominado Federal Way Link Extension , había sido aprobado inicialmente en el marco de Sound Transit 2, pero requirió financiación adicional que se incluyó en Sound Transit 3. [ 98 ]  

El servicio interlínea en el tramo Lynnwood–Seattle comenzó en febrero de 2026 con el lanzamiento de pruebas simuladas para la Línea 2.  El servicio simulado permitió a los pasajeros abordar trenes entre las estaciones Lynnwood City Center e International District/Chinatown y agregó trenes para alcanzar una frecuencia de cuatro minutos durante las horas pico. [ 99 ] La nueva línea, que da servicio al Eastside , se inauguró por completo en marzo de 2026 con 13 estaciones compartidas con la  Línea 1. [ 100 ] [ 101 ] Se planeó que la Línea 2 completa  entre Seattle y el Eastside abriera antes que Lynnwood y proporcionara acceso a las instalaciones de operaciones y mantenimiento de Bellevue . Para mantener frecuencias de ocho minutos con trenes de cuatro vagones, algunos vehículos se estacionaron durante la noche en las instalaciones de operaciones y mantenimiento de SODO y en algunas estaciones. El servicio nocturno se redujo y se mantuvo temporalmente parte del servicio de autobuses en el corredor Lynnwood–Seattle para acomodar a los pasajeros adicionales. [ 102 ]

Ruta

Un tren de cuatro vagones circula por calles secundarias pasando por una intersección vacía.
Un tren ligero de cuatro vagones de la Serie 1 en Martin Luther King Jr. Way en Seattle.

La terminal norte compartida de la  Línea 1 y  la Línea 2 es la estación Lynnwood City Center , un importante centro de autobuses en el condado de Snohomish en el centro de Lynnwood . [ 103 ] Los trenes salen de la estación en una vía elevada sobre Scriber Creek y un patio de autobuses utilizado por el Distrito Escolar de Edmonds antes de seguir el lado oeste de la Interestatal 5. [ 104 ] [ 105 ] Las vías descienden a una trinchera antes de cruzar la Interestatal 5 en Mountlake Terrace . [ 106 ] [ 107 ] La  Línea 1 llega a su primera parada de salida, la estación Mountlake Terrace sobre la calle 236 Suroeste, y continúa en una vía elevada que cruza la Ruta Estatal 104 hacia Shoreline y el condado de King . Luego, las vías descienden a la superficie y continúan a lo largo del lado este de la Interestatal 5 para servir a la estación Shoreline North/185th , que incluye un estacionamiento de dos pisos y la terminal del sistema de transporte rápido de autobuses Swift . [ 103 ] [ 104 ] La  Línea 1 continúa hacia el sur hasta llegar a la estación elevada Shoreline South/148th , la futura terminal de la Línea Stride S3 . [ 103 ] La línea viaja a Seattle por una vía elevada que pasa por Jackson Park y la futura estación Pinehurst , una estación de relleno en Northeast 130th Street. [ 106 ] [ 108 ] Después de un breve regreso a la alineación de superficie, las vías viajan por varias calles cerca del Northgate Mall y se acercan a la estación Northgate . [ 104 ] [ 106 ]

Desde la estación Northgate, la línea continúa hacia el sur elevada antes de sumergirse en el túnel Northgate Link en el barrio Maple Leaf . El túnel de 3.4 millas (5.5 km) viaja hacia el sureste a través de Roosevelt , dando servicio a una estación cerca de Northeast 65th Street, y hacia el sur hasta la estación U District antes de llegar al campus de la Universidad de Washington . [ 109 ] [ 110 ] El túnel viaja hacia el sureste por debajo del campus hasta la estación University of Washington, ubicada cerca de Husky Stadium , desde donde se dirige hacia el sur en el túnel University Link , cruzando por debajo del Montlake Cut del Lake Washington Ship Canal y State Route 520 antes de tomar un giro hacia el suroeste. El túnel sube Capitol Hill y pasa por debajo de Interlaken Park y Volunteer Park antes de girar directamente hacia el sur para entrar en la estación Capitol Hill en el lado este de Broadway . [ 111 ] El túnel hace un giro gradual hacia el oeste, descendiendo hacia el sur hasta East Union Street, y cruza por debajo de la Interestatal 5 en Pine Street. [ 112 ] [ 113 ] Se fusiona con el Túnel de Tránsito del Centro de Seattle dentro del Túnel de Pine Street Stub, donde anteriormente se fusionaba con los autobuses de la estación Convention Place . [ 114 ] [ 115 ] 

El túnel de tránsito del centro, anteriormente compartido entre trenes de tren ligero y autobuses, [ 116 ] viaja hacia el oeste por debajo de Pine Street a través de la estación Westlake y hacia el sur por la 3rd Avenue a través de las estaciones Symphony y Pioneer Square en el centro de Seattle . [ 115 ] El túnel termina en la estación International District/Chinatown , adyacente a la estación King Street (servida por Amtrak y el tren de cercanías Sounder ); [ 117 ] desde aquí,  la Línea 1 viaja hacia el sur a través de SoDo a lo largo del lado este del SODO Busway mientras que la Línea 2  gira hacia el este para cruzar el lago Washington . [ 101 ] La sección SoDo tiene dos estaciones, Stadium y SODO , e incluye varios cruces con barreras . [ 53 ] Desde la estación SODO, la vía asciende a una vía elevada que viaja hacia el este a lo largo de South Forest Street, [ 112 ] [ 118 ] pasando por el patio de maniobras y la instalación de mantenimiento de la línea . [ 119 ] La vía elevada pasa por encima de Airport Way y termina en un terraplén bajo la Interestatal 5, entrando en el túnel de Beacon Hill. [ 120 ] [ 121 ]

El túnel de Beacon Hill recorre aproximadamente una milla (1,6 km) bajo Beacon Hill , dando servicio a una estación en Beacon Avenue South. [ 122 ] Los trenes salen del túnel por el lado este de la colina, giran hacia el sureste y se acercan a la estación elevada de Mount Baker en la intersección de Rainier Avenue South y Martin Luther King Jr. Way South. [ 123 ] Los trenes de tren ligero descienden desde la estación de Mount Baker hasta la mediana de Martin Luther King Jr. Way South, circulando a nivel con prioridad de señalización en 28 cruces de calles. [ 124 ] [ 125 ] La Línea 1 pasa por el Valle de Rainier y da servicio a tres estaciones a nivel, Columbia City , Othello y Rainier Beach , antes de salir de Seattle. [ 112 ] [ 126 ]  

La línea entra en Tukwila y cruza hacia el oeste por la Interestatal 5 y una línea principal de ferrocarril en Boeing Access Road, cerca de Boeing Field , antes de girar hacia el sur por East Marginal Way South. La  Línea 1 continúa hacia el sur por el río Duwamish, viajando sin parar a través de Tukwila en una vía elevada de 4.7 millas (7.6 km) . [ 127 ] La vía recorre los lados oeste de la Ruta Estatal 599 y la Interestatal 5 hacia Southcenter Mall , donde gira hacia el oeste por la Ruta Estatal 518. La línea pasa por la estación Tukwila International Boulevard, que alberga una instalación de estacionamiento disuasorio de 600 plazas, y gira hacia el sur en la mediana de Airport Expressway hacia SeaTac . Los trenes de tren ligero continúan por el lado este del Aeropuerto Internacional de Seattle-Tacoma, deteniéndose en la estación SeaTac/Aeropuerto cerca de las terminales del aeropuerto, antes de llegar a la estación Angle Lake . [ 112 ] [ 118 ] Luego continúan hacia el sur por la Ruta Estatal 509 y la Interestatal 5 para dar servicio a las estaciones de Kent Des Moines y Star Lake , ambas en las afueras de Kent . La línea viaja hacia el sur hasta su terminal en la estación Federal Way Downtown , ubicada cerca del centro comercial Commons at Federal Way en la ciudad del mismo nombre . [ 128 ] 

La  Línea 1, aunque oficialmente es una línea de "tren ligero", también ha sido descrita como un híbrido de " metro ligero " por expertos en transporte debido a sus secciones separadas del nivel y al uso de trenes más largos que los sistemas típicos de tren ligero estadounidenses. [ 124 ] Tiene 41 millas (66 km) de longitud e incluye 7 millas (11 km) de vías a nivel; [ 129 ] estas vías a nivel incluyen algunos segmentos a lo largo de autopistas que están separadas de las carreteras que las cruzan. [ 130 ] [ 131 ]  

Estaciones

Las estaciones de la  Línea 1 están espaciadas aproximadamente a una milla (1,6 km) de distancia en la mayoría de las áreas y están construidas con andenes de 380 pies (120 m) de largo para acomodar trenes de cuatro vagones. [ 131 ] [ 132 ] Algunas estaciones están separadas por niveles, con andenes subterráneos o elevados conectados a las entradas de superficie por escaleras, escaleras mecánicas y ascensores, mientras que otras fueron construidas a nivel de calle. [ 131 ] Las estaciones de la línea incluyen conexiones de autobús, [ 133 ] máquinas expendedoras de billetes , letreros de información de llegadas en tiempo real , arte público y aparcamiento para bicicletas. [ 134 ] [ 135 ] Las estaciones también están diseñadas con líneas de visión claras en los andenes, teléfonos y luces de emergencia, y están monitoreadas con cámaras de vigilancia. [ 136 ]  

Todas las estaciones están conectadas a rutas de autobuses locales, incluidos los servicios paralelos de King County Metro , Community Transit y Sound Transit Express que paran en varias estaciones de Link. [ 137 ] Metro Flex, un servicio de transporte a demanda operado por King County Metro y Via , se lanzó en 2019 en cinco estaciones en Rainier Valley y Tukwila. Aceptaba tarifas de Metro y estaba subvencionado por el gobierno de la ciudad de Seattle. [ 138 ] A partir de 2024, hay siete estaciones que cuentan con instalaciones públicas de estacionamiento disuasorio; [ 139 ] [ 140 ] para otras estaciones, Sound Transit y los gobiernos locales fomentan medios de transporte alternativos hacia y desde las estaciones, incluyendo el uso del autobús, caminar o andar en bicicleta. [ 141 ] [ 142 ]

Notas

  1. 1 2 3 4 Las estaciones del túnel de transporte público del centro de Seattle abrieron originalmente como instalaciones exclusivas para autobuses el 15 de septiembre de 1990, y el servicio de tren ligero comenzó el 18 de julio de 2009. [ 145 ]
  2. Anteriormente llamada estación University Street hasta el 30 de agosto de 2024. [ 97 ]

Servicio

Los trenes de la Línea 1  circulan 20 horas al día de lunes a sábado, de 5:00  a 1:00  , y 18 horas los domingos y festivos federales , de 6:00  a medianoche. [ 143 ] [ 146 ] Los trenes operan con mayor frecuencia durante las horas punta de los días laborables , pasando cada ocho minutos de 6:00  a 9:30  y de 15:00  a 18:30  . Los trenes pasan cada 10 minutos durante el mediodía y la tarde de los días laborables y todo el día los fines de semana. La frecuencia de los trenes se reduce a cada 15 minutos durante las primeras horas de la mañana y las últimas de la noche de todos los días. [ 143 ]

El viaje de extremo a extremo desde Lynnwood hasta la estación Federal Way toma 88  minutos, mientras que los viajes entre la estación SeaTac/Aeropuerto y el centro de Seattle toman 38 minutos. [ 143 ] El corredor SeaTac–Westlake era servido anteriormente por la ruta de autobús 194 de King County Metro, que tomaba 32 minutos para viajar entre las dos áreas y usaba paradas de autobús que estaban más cerca de la terminal. La ruta de autobús operaba con intervalos menos frecuentes, estaba sujeta a retrasos por tráfico y tenía horarios de operación más cortos. [ 147 ] [ 148 ] Hasta 2026, los viajes finales en dirección norte durante el servicio nocturno terminaban en la estación Beacon Hill en lugar de continuar por el centro de Seattle. El acortamiento permitió que el mantenimiento nocturno comenzara antes en algunas secciones; estos trenes terminaban en la estación Stadium antes de un cambio en 2024. [ 149 ] Los viajes fueron eliminados en marzo de 2026 y reemplazados por un autobús nocturno desde la estación SeaTac/Aeropuerto hasta el centro de Seattle que opera con frecuencias de 30 minutos. [ 150 ] [ 151 ]

Número de pasajeros

Los trenes de la Línea 1  transportaron más de 35,5  millones de pasajeros en total en 2025 y un promedio de 102.895 pasajeros en días laborables. [ 1 ] La afluencia de pasajeros se mide mediante contadores infrarrojos a bordo que registran automáticamente el número de personas que entran y salen del tren. [ 60 ] [ 153 ] A partir de 2025Aproximadamente el 32  por ciento de los vehículos de la Serie 1 tienen contadores automáticos de pasajeros, mientras que todos los vehículos de la Serie 2 los tenían instalados. [ 133 ]

El número de pasajeros en la  Línea 1 ha aumentado significativamente desde el inicio del servicio en 2009, cuando promediaba 15 500 por día laborable. [ 154 ] En 2010, el número de pasajeros cayó por debajo de los niveles proyectados debido a una recesión económica , con solo 21 611 pasajeros diarios en la línea. [ 155 ] El número de pasajeros aumentó significativamente en los años siguientes, superando los 25 000 pasajeros diarios en 2012, [ 156 ] 30 000 en 2014, [ 157 ] y 35 000 en 2015. [ 158 ] La apertura de la extensión University Link en marzo de 2016 aumentó el número de pasajeros diarios en un 66 por ciento en su primer mes de operación, [ 159 ] y promedió 66 203 pasajeros diarios durante el último trimestre del año. [ 160 ] El 8 de abril de 2016 se estableció un récord de pasajeros en un solo día con un estimado de 82.361 embarques, [ 161 ] debido al partido inaugural en casa de los Seattle Mariners y la Emerald City Comic Con . [ 159 ] El récord fue superado cinco meses después, el 30 de septiembre, con un estimado de 101.000 pasajeros, cuando el equipo de fútbol americano Washington Huskies y los Seattle Mariners jugaron partidos en casa. [ 162 ]

El número de pasajeros cayó a 9,7  millones en total en 2020, una disminución del 61  por ciento con respecto a 2019, debido a la pandemia de COVID-19 y otras reducciones de servicio. [ 163 ] El número de pasajeros de Link creció después de la apertura en 2021 de la extensión Northgate Link y la reapertura de las oficinas, lo que le permitió superar los niveles previos a la pandemia. [ 164 ] La línea estableció un récord de un solo día de 115.600  abordajes el 11 de julio de 2023, durante el Juego de Estrellas de las Grandes Ligas de Béisbol en el T-Mobile Park . Este récord fue superado dos veces para finales de mes debido a varios eventos simultáneos de fin de semana, incluidos los conciertos de The Eras Tour de Taylor Swift en Lumen Field , los juegos de los Mariners en el T-Mobile Park y la Capitol Hill Block Party . Se estableció un nuevo récord de 136.800 abordajes el 23 de julio y se convirtió en el duodécimo día de ese mes con más de 100.000 abordajes. [ 165 ] El récord fue superado el 30 de agosto con 157.692 abordajes el día de la inauguración de la extensión del enlace de Lynnwood . [ 1 ] En septiembre de 2024, el promedio de pasajeros de la línea los sábados había alcanzado los 82.000 abordajes, superando el promedio de los días laborables de 79.000 pasajeros. [ 166 ]   

La  Línea 1 estableció un nuevo récord de pasajeros el 11 de febrero de 2026, durante un desfile de celebración de los Seattle Seahawks tras la victoria del equipo en su segundo Super Bowl . Según estimaciones preliminares, unos 200 000 pasajeros abordaron los trenes. [ 167 ]

Tarifas

La  Línea 1 utiliza un sistema de comprobante de pago , que requiere un pago válido antes de abordar y carece de barrera de torniquete en las estaciones. Los pasajes se pueden comprar como boletos de papel en las máquinas expendedoras de boletos en las estaciones, [ 168 ] crédito o pases cargados en una tarjeta ORCA , una tarjeta de pago sin contacto o plataforma, o a través de una aplicación móvil de boletos . [ 169 ] [ 170 ] Los embajadores de pasajes verifican los pasajes válidos mientras están a bordo de los trenes o en la zona de pago de pasajes de las estaciones; [ 171 ] a los pasajeros que no presentan un boleto válido o una tarjeta ORCA validada se les ofrecen materiales educativos y advertencias. [ 172 ] Hasta 2021, los inspectores de pasajes y los oficiales de policía de tránsito verificaban los pasajes y emitían advertencias o una multa de $124 a los pasajeros que no presentaban una forma de pago válida. [ 173 ] [ 174 ] Tras el despido de los inspectores de pasajes, se estima que el 42  por ciento de los pasajeros en enero de 2022 no pagaron su pasaje. [ 175 ] En septiembre de 2022 se aprobó un nuevo programa dirigido por embajadores de tarifas, que implementa un sistema de varios pasos con sanciones monetarias que comienzan con la tercera infracción y una infracción de $124 por una quinta infracción. [ 176 ]

Las tarifas son una tarifa plana de $3 para adultos, $1 para pasajeros elegibles para tarifas reducidas y gratis para personas de 18 años o menos. [ 177 ] Hasta 2024, las tarifas se calculaban en función de la distancia recorrida y oscilaban entre $2.25 y $3.50 para adultos. [ 178 ] Los usuarios de la tarjeta ORCA debían acercar un lector antes y después de viajar en tren para calcular la tarifa. [ 179 ] Las tarifas reducidas están disponibles para pasajeros de la tercera edad, personas con discapacidades y pasajeros de bajos ingresos inscritos en ORCA Lift. [ 180 ] [ 181 ] Los transbordos desde otros modos, incluidos autobuses, taxis acuáticos y tranvías , solo se aceptan utilizando tarjetas ORCA. [ 182 ] Desde septiembre de 2022, las tarifas para pasajeros menores de 19 años han sido gratuitas como parte de una subvención estatal para el transporte. [ 183 ]

Material rodante y equipo

En el interior de un tren vacío con grandes ventanales, varios asientos dispuestos en paralelo y perpendicularmente, pasamanos metálicos y asideros negros. La sección más alejada del tren, con asientos adicionales, está elevada y cuenta con una pequeña escalera.
Interior de un vehículo de tren ligero de la Serie 1  fabricado por Kinkisharyo - Mitsui.
Vista exterior de un tren estacionado en un garaje.
Exterior of a Series 2 light rail vehicle, a variant of the Siemens S700[a] that entered service in 2021

The original "Series 1" fleet used on the 1 Line consisted of 62 low-floor light rail vehicles manufactured in Japan by Kinkisharyo.[133] The Kinkisharyo vehicles, built through a joint venture with Mitsui & Co.,[184] have 74 seats and can carry 194 seated and standing passengers at standard capacity; a maximum "crush load" of 252 passengers per car can be carried by Link trains for short distances.[185] Individual railcars are 95 feet (29.0 m) long and 8.7 feet (2.7 m) wide, sporting dual cabs that allow cars to travel in either direction.[186] The interior is 70 percent low-floor, while the remaining 30 percent is raised above the floor and accessed via stairs. Railcars include four doors on each side, fold-up seating areas for wheelchairs, and two bicycle hooks above luggage storage areas.[187][188] 1 Line trains are typically arranged into three-car and four-car sets,[189] but until 2021 all trains were two or three cars long.[185][190] The trains have a top speed of 58 miles per hour (93 km/h), but typically operate at 35 mph (56 km/h) on surface sections and 55 mph (89 km/h) on elevated and tunneled sections.[186][191] Link uses a form of positive train control to prevent trains from exceeding the set speed limit for a given area.[192]

Trains are supplied electricity through an overhead catenary that is energized at 1,500 V DC and converted to three-phasealternating current through on-board inverters.[187] While other North American light rail systems use   Sound Transit optó por utilizar tecnología de 750 V CC y 1500 V CC para reducir el número de subestaciones eléctricas , que están separadas aproximadamente una milla (1,6 km) . [ 187 ] [ 193 ] Sound Transit realizó su pedido inicial de 31 vehículos de tren ligero en 2003 y añadió cuatro vehículos más en 2005 para la extensión a la estación SeaTac/Aeropuerto. [ 184 ] [ 194 ] Los vagones fueron ensamblados en Everett, para cumplir con los requisitos de Buy America , [ 195 ] y entregados entre 2006 y 2008. [ 196 ] [ 197 ] Otros 27 vehículos fueron encargados para la extensión de University Link en 2009 y fueron entregados entre 2010 y 2011. [ 196 ] La flota de la Línea 1se almacena y mantiene en una base operativa de 26 acres (10,5 ha) en SoDo, entre las estaciones SODO y Beacon Hill. Se inauguró en 2007, con un costode construcción de $74 millones, y tiene una capacidad de 105 vehículos de tren ligero, incluyendo nueve bahías dentro deledificio de mantenimiento de 162,000 pies cuadrados (15,100 m 2 ) que puede albergar 16 vehículos. [ 198 ] [ 199 ] [ 200 ] Los trenes de la Línea 1son operados y mantenidos por King County Metro bajo un contrato con Sound Transit que fue renovado en 2019 y está programado para expirar a finales de 2023. [ 201 ] [ 202 ]      

In September 2016, Sound Transit approved a $554 million order to Siemens Mobility for 122 S700[a] "Series 2" light rail vehicles to serve planned extensions to Northgate, Lynnwood, the Eastside, and Federal Way.[204] Another 30 vehicles were added to the order in April 2017, bringing the total to 152 vehicles.[205] The first Series 2 car arrived at Sound Transit's maintenance facility in June 2019, featuring the same seating capacity but a wider central walkway and other new features.[206][207] The first Siemens cars entered service on May 14, 2021.[85] A satellite maintenance facility in Bellevue was opened in 2021 to accommodate 96 more vehicles, including part of the new fleet and older Series 1 vehicles undergoing retrofit work.[208][209] A third facility is planned to be built near Federal Way to support future system expansion.[210]

Future plans

Sound Transit's expansion ballot measures, passed as Sound Transit 2 in 2008 and Sound Transit 3 in 2016, enabled the planning of future Link light rail extensions, scheduled to open in stages between 2021 and 2040.[211][212] In 2032, the 3 Line to West Seattle is scheduled to begin service, temporarily operating between Alaska Junction and SODO station.[213] The opening of the Ballard Link Extension by 2039, traveling via a new tunnel through Downtown Seattle,[214][215] is planned to split the corridor between two lines: the 1 Line, operating from Ballard to Tacoma via the Rainier Valley and Sea-Tac Airport; and the 3 Line, operating from Lynnwood (and later Everett) to West Seattle.[212][216] Two infill stations along the current route of the 1 Line are planned to open in 2031 at South Graham Street in the Rainier Valley and Boeing Access Road in northern Tukwila.[217]

Notes

  1. 12At the time of purchase and receipt of the first cars, the second generation of light rail vehicles were a version of Siemens' model S70, but Siemens retroactively rebranded this version as the S700 in 2020.[203]

References

  1. 12345"System performance tracker: Link Ridership". Sound Transit. Retrieved February 20, 2026.
  2. "A look into rail's past". The Seattle Times. February 1, 1987. p. B3.
  3. 12Crowley, Walt (October 2, 2000). "Street Railways in Seattle". HistoryLink. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  4. Dorpat, Paul (November 6, 1983). "Plush as a Parlor: Some Interurban commuters paid more for a cushy ride". The Seattle Times. p. 6.
  5. Crowley, Walt (September 19, 2000). "Interurban Rail Transit in King County and the Puget Sound Region". HistoryLink. Retrieved March 24, 2018.
  6. "Seattle's streetcar history". The Seattle Times. December 10, 2007. p. A6. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  7. Sipe, Tyler (March 5, 2017). "Off track: Seattle rejects first mass transit ballot measure on March 5, 1912". The Seattle Times. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  8. Lindblom, Mike (July 30, 2002). "Another '60s revival: running a monorail along Interstate 5". The Seattle Times. p. A1. Retrieved September 17, 2017.
  9. 123456Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
  10. Coffman, Larry (4 de febrero de 1968). "Transporte rápido: todos coinciden en que es necesario, pero ¿de qué tipo?". The Seattle Times . pág. 5. 
  11. "El martes es el día del 'empuje'; el tema más importante: el transporte rápido". The Seattle Times . 17 de mayo de 1970. pág. B1. 
  12. «La propuesta de transporte público de Seattle agrada a todos menos a los votantes» . The New York Times . 14 de junio de 1970. pág. 16. Archivado del original el 13 de febrero de 2018. Consultado el 12 de febrero de 2018 . 
  13. Cohen, Josh (14 de octubre de 2016). "Cómo Seattle desperdició su oportunidad de tener un sistema de metro" . Crosscut.com . Archivado del original el 17 de septiembre de 2017. Recuperado el 17 de septiembre de 2017 .
  14. Lane, Bob (20 de marzo de 1975). "El programa del metro mira hacia el futuro". The Seattle Times . pág. H7. 
  15. Lane, Bob (22 de marzo de 1981).Un estudio sugiere que un sistema de tren ligero podría solucionar los problemas de transporte público. The Seattle Times , pág.  A16.
  16. Lane, Bob (22 de abril de 1988). "Metro crea vías para vías para el futuro". The Seattle Times . pág. B1. 
  17. Matassa Flores, Michele; Parrish, WY; Shatzkin, Kate (13 de septiembre de 1989). "La influencia de las ciudades despega: roles ampliados con mayor peso para Sea-Tac y Federal Way". The Seattle Times . pág. F1. 
  18. Bergsman, Jerry (9 de julio de 1986). "Consejo del panel: Planifique ahora para el ferrocarril". The Seattle Times . pág. H1. 
  19. «Apéndice G: Informe técnico sobre justicia ambiental» . Declaración final de impacto ambiental del proyecto de tren ligero Central Link . Sound Transit. 22 de octubre de 1999. pág. G-36. OCLC 42730086. Archivado del original el 19 de enero de 2018. Recuperado el 3 de enero de 2018 a través de Google Books.  
  20. Lane, Bob (9 de noviembre de 1988). "Cuestiones electorales: Los votantes dicen 'adelante' con el transporte ferroviario". The Seattle Times . pág. E9. 
  21. Bergsman, Jerry (21 de agosto de 1990). "La aprobación de Everett podría acelerar el transporte regional". The Seattle Times . pág. C2. 
  22. Kelleher, Susan (16 de julio de 2001). "Hechos distorsionados llevaron a la ruta ferroviaria de Rainier" . The Seattle Times . Consultado el 22 de noviembre de 2018 .
  23. Sachefer, David (7 de julio de 1993). "La unidad de transporte regional recibe luz verde". The Seattle Times . pág. B3. 
  24. Lilly, Dick (5 de abril de 1994). "Una opción de tren ligero atravesaría el valle de Rainier". The Seattle Times . pág. B3. 
  25. Schaefer, David (12 de febrero de 1995). "¿Vamos por buen camino? Preguntas y respuestas a la propuesta de 6700 millones de dólares". The Seattle Times . pág. A1. 
  26. Schaefer, David; Murakami, Kery (15 de marzo de 1995). "Plan de transporte público descarrilado: votantes de Pierce y del condado de Snohomish rechazan la propuesta de 6700 millones de dólares" . The Seattle Times . pág. A1. Archivado del original el 19 de enero de 2018. Consultado el 18 de enero de 2018 . 
  27. 1 2 Schaefer, David (6 de octubre de 1996). "Analizando la nueva propuesta de transporte" . The Seattle Times . pág. A1. Archivado del original el 18 de septiembre de 2017. Recuperado el 17 de septiembre de 2017 . 
  28. Schaefer, David (6 de noviembre de 1996). "Los votantes respaldan el plan de transporte público al cuarto intento" . The Seattle Times . pág. A1. Archivado del original el 3 de marzo de 2016. Consultado el 17 de septiembre de 2017 . 
  29. Schaefer, David (10 de diciembre de 1997). "Los residentes debaten la ruta del tren ligero: ¿debajo o fuera de nuestro barrio, dicen algunos?" . The Seattle Times . pág. B1. Archivado del original el 14 de agosto de 2017. Recuperado el 17 de septiembre de 2017 . 
  30. "Sound Transit Motion No. M98-40" (PDF) . Sound Transit. 14 de mayo de 1998. Archivado del original (PDF) el 13 de septiembre de 2017. Consultado el 17 de septiembre de 2017 .
  31. «La Junta Directiva de Sound Transit alcanza un hito histórico al seleccionar la ruta para el tren ligero Link central» (Comunicado de prensa). Seattle, Washington: Sound Transit. 18 de noviembre de 1999. Archivado del original el 3 de marzo de 2016. Consultado el 17 de septiembre de 2017 .
  32. "Light-rail costs soars $1 billion". The Seattle Times. December 13, 2000. p. A1. Archived from the original on January 14, 2016. Retrieved September 17, 2017.
  33. Garber, Andrew (January 18, 2001). "Congressman wants to delay light-rail money". The Seattle Times. p. A1. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  34. Garber, Andrew (November 18, 2000). "Price puts tunnel on hold". The Seattle Times. p. A1. Archived from the original on August 14, 2017. Retrieved September 17, 2017.
  35. Garber, Andrew (January 20, 2001). "Half-billion allocated for Sound Transit". The Seattle Times. p. B1. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  36. "Central Link Initial Segment and Airport Link Before and After Study – Final Report"(PDF). Sound Transit. February 2014. p. 1. Retrieved March 21, 2018 via Washington State Department of Transportation.
  37. Garber, Andrew (September 26, 2001). "Sound Transit says it can build 14-mile line; light rail stops short of airport". The Seattle Times. p. B1. Archived from the original on January 6, 2017. Retrieved September 17, 2017.
  38. Garber, Andrew (September 28, 2001). "Shorter light-rail line OK'd". The Seattle Times. p. A1. Archived from the original on January 7, 2017. Retrieved September 17, 2017.
  39. Pryne, Eric (November 30, 2001). "Sound Transit adopts 14-mile route; light-rail construction could start in summer". The Seattle Times. p. A1. Archived from the original on January 6, 2017. Retrieved September 17, 2017.
  40. Pryne, Eric (15 de marzo de 2002). "Sound Transit recibe luz verde para comprar terrenos para el tren ligero" . The Seattle Times . pág. B1. Archivado del original el 7 de enero de 2017. Recuperado el 17 de septiembre de 2017 . 
  41. Lindblom, Mike (2 de noviembre de 2002). "Sound Transit recibe luz verde para el tren ligero" . The Seattle Times . pág. B1. Archivado del original el 18 de septiembre de 2017. Recuperado el 17 de septiembre de 2017 . 
  42. Gilmore, Susan (11 de febrero de 2003). "Juez desestima multas de $30" . The Seattle Times . pág. A1. Archivado del original el 18 de septiembre de 2017. Recuperado el 17 de septiembre de 2017 . 
  43. Pryne, Eric (29 de junio de 2002). "Se reavivan las esperanzas de Sound Transit; no se requiere la aprobación de Tukwila"." . The Seattle Times . p.  A1. Archivado del original el 6 de enero de 2017 . Consultado el 17 de septiembre de 2017 .
  44. Lindblom, Mike (24 de octubre de 2003). "La construcción del tren ligero podría comenzar en dos semanas" . The Seattle Times . pág. A1. Archivado del original el 18 de septiembre de 2017. Recuperado el 17 de septiembre de 2017 . 
  45. Lindblom, Mike (8 de noviembre de 2003). "Hoy se inician las obras del tren ligero" . The Seattle Times . pág. B1. Archivado del original el 12 de octubre de 2014. Consultado el 17 de septiembre de 2017 . 
  46. 1 2 "Sound Transit instala los primeros rieles para la línea de tren ligero Central Link" (Comunicado de prensa). Sound Transit. 18 de agosto de 2005. Archivado del original el 28 de julio de 2017. Recuperado el 17 de septiembre de 2017 .
  47. Robinson, Lauren (16 de septiembre de 2004). "La línea de tren ligero avanza a toda velocidad" . Seattle Daily Journal of Commerce . Archivado del original el 18 de septiembre de 2017. Consultado el 17 de septiembre de 2017 .
  48. "Sound Transit Board Meeting Summary Minutes"(PDF). Sound Transit. March 10, 2005. Archived from the original(PDF) on September 17, 2017. Retrieved September 17, 2017.
  49. Hadley, Jane (February 24, 2005). "Artifacts dug up at light rail bridge site". Seattle Post-Intelligencer. Retrieved January 22, 2025.
  50. Gilmore, Susan (September 23, 2005). "Bus tunnel shuts down tonight for 2 years". The Seattle Times. p. A1. Archived from the original on February 2, 2017. Retrieved September 17, 2017.
  51. Gildner, Joe; Sage, Dick (March 23, 2006). "Sound Transit digs a cutting-edge tunnel". Seattle Daily Journal of Commerce. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  52. "Sound Transit completes first two Central Link light rail stations" (Press release). Sound Transit. May 30, 2006. Archived from the original on July 28, 2017. Retrieved September 17, 2017.
  53. 12Lindblom, Mike (March 16, 2007). "Sound Transit begins light-rail train tests in Sodo". The Seattle Times. p. B2. Archived from the original on September 17, 2017. Retrieved September 17, 2017.
  54. "Downtown Seattle Transit Tunnel to reopen Sept. 24"(PDF). Sound Transit. August 2007. Archived(PDF) from the original on December 24, 2016. Retrieved September 17, 2017.
  55. "Tunnel boring machine completes second Beacon Hill light rail tunnel" (Press release). Sound Transit. March 4, 2008. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  56. Lindblom, Mike (August 13, 2008). "Sound Transit to run test trains through Rainier Valley". The Seattle Times. p. B1. Archived from the original on January 5, 2017. Retrieved September 17, 2017.
  57. "Sound Transit completes construction of elevated light rail trackway between Seattle and Tukwila" (Press release). Sound Transit. September 27, 2007. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  58. Lindblom, Mike (March 30, 2006). "Rail work clogs the way on MLK". The Seattle Times. p. A1. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  59. Earl, Joni (July 16, 2009). "6 years and $2.4B later, Central Link ready to roll". Seattle Daily Journal of Commerce. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  60. 12Lindblom, Mike (July 30, 2009). "Light rail averaging 12,000 riders per weekday so far". The Seattle Times. Archived from the original on August 16, 2016. Retrieved August 25, 2016.
  61. "Central Puget Sound Regional Transit Authority 2016 Financial Plan"(PDF). Sound Transit. June 2016. p. 16. Archived from the original(PDF) on September 18, 2017. Retrieved September 17, 2017.
  62. Lindblom, Mike (July 20, 2009). "Light-rail trains run smoothly, if not to capacity, on first day". The Seattle Times. p. B1. Archived from the original on November 28, 2016. Retrieved September 17, 2017.
  63. Lindblom, Mike (December 17, 2009). "Airport rail station opens Saturday". The Seattle Times. p. A1. Archived from the original on January 16, 2017. Retrieved September 17, 2017.
  64. Lindblom, Mike (April 4, 2010). "Sound Transit installs lube machines to quiet noisy tracks". The Seattle Times. p. B1. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  65. Lindblom, Mike (June 24, 2011). "Light-rail contract dispute is resolved". The Seattle Times. p. B1. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  66. McNichols, Joshua (February 26, 2015). "South Seattle Development Is Slow, Despite Promise Of Light Rail". KUOW. Archived from the original on June 9, 2017. Retrieved September 17, 2017.
  67. Pryne, Eric (April 6, 2009). "Recession stalls building boom along South Seattle light-rail tracks". The Seattle Times. p. A1. Archived from the original on May 10, 2017. Retrieved September 17, 2017.
  68. Lindblom, Mike (September 17, 2015). "Light-rail trains to run every 6 minutes between Seattle and Sea-Tac". The Seattle Times. p. B1. Archived from the original on October 11, 2016. Retrieved September 17, 2017.
  69. Beekman, Daniel (March 19, 2016). "Capitol Hill, UW light-rail stations open to big crowds". The Seattle Times. Archived from the original on January 1, 2017. Retrieved September 17, 2017.
  70. Lindblom, Mike (March 24, 2016). "Sound Transit to add longer trains to meet unexpected light-rail demand". The Seattle Times. p. B1. Archived from the original on September 11, 2017. Retrieved September 17, 2017.
  71. Lindblom, Mike (September 23, 2017). "Angle Lake light-rail station opens Saturday with party". The Seattle Times. p. B3. Archived from the original on September 26, 2016. Retrieved September 17, 2017.
  72. Lindblom, Mike (October 25, 2018). "Sound Transit will add stairs and stronger escalators to fix UW Station breakdowns". The Seattle Times. Retrieved October 25, 2018.
  73. Merten, Paxtyn (7 de octubre de 2020). "Sound Transit descarta los planes para reemplazar las escaleras mecánicas de la estación UW, citando mejoras en el rendimiento" . Puget Sound Business Journal . Consultado el 13 de septiembre de 2021 .
  74. Lindblom, Mike (2 de octubre de 2018). «Grietas en las vías del tren ligero ralentizan los trenes en el sur de Seattle; se esperan cierres por reparaciones durante el fin de semana» . The Seattle Times . Consultado el 25 de octubre de 2018 .
  75. Netzler, Kat (18 de septiembre de 2019). "El tren ligero Link estrena colores de línea" . The Platform . Sound Transit . Consultado el 18 de septiembre de 2019 .
  76. Martínez-Vásquez, Jackie (14 de noviembre de 2019). "Sound Transit dejará de usar el nombre de "Línea Roja"" . The Platform . Sound Transit . Consultado el 14 de noviembre de 2019 .
  77. Shaner, Eliza (9 de abril de 2020). "Nuevos nombres de líneas en 2021" . The Platform . Sound Transit . Consultado el 9 de abril de 2020 .
  78. Craighead, Callie (31 de agosto de 2021). "Sound Transit se prepara para renovar la imagen de las líneas de tren ligero de Seattle con nuevos nombres, números y colores" . Seattle Post-Intelligencer . Consultado el 1 de septiembre de 2021 .
  79. Lindblom, Mike (2 de enero de 2020). "Los usuarios del tren ligero pueden esperar trenes más concurridos y con menor frecuencia a medida que comienzan las obras de construcción de las vías en el centro" . The Seattle Times . pág. A1 . Consultado el 8 de enero de 2020 . 
  80. "Los horarios de Connect 2020 Link se ajustan a cada 13-15 minutos" . The Platform . Sound Transit. 8 de enero de 2020. Consultado el 8 de enero de 2020 .
  81. "Connect 2020 concluye, poniendo fin a los transbordos del tren ligero Link en Pioneer Square y a las restricciones para bicicletas" (Comunicado de prensa). Sound Transit. 22 de marzo de 2020. Consultado el 24 de marzo de 2020 .
  82. Groover, Heidi; Baruchman, Michelle (15 de marzo de 2020). "Las interrupciones en el servicio de tren ligero continuarán tras los problemas detectados durante las obras en las vías del centro" . The Seattle Times . Consultado el 24 de marzo de 2020 .
  83. "ST to temporarily reduce service further on Link and some ST Express routes" (Press release). Sound Transit. April 16, 2020. Retrieved September 1, 2020.
  84. "Sound Transit to increase service on Link light rail effective September 19" (Press release). Sound Transit. August 11, 2020. Retrieved September 1, 2020.
  85. 12Luczak, Marybeth (May 17, 2021). "New Sound Transit LRVs Enter Service". Railway Age. Retrieved May 19, 2021.
  86. Luczak, Marybeth (October 4, 2021). "Sound Transit Northgate Link LRT: 'Welcome Aboard'". Railway Age. Retrieved October 9, 2021.
  87. DeMay, Daniel (September 2, 2016). "Sound Transit completes tunneling for Northgate light rail extension". Seattle Post-Intelligencer. Retrieved October 9, 2021.
  88. Long, Katherine (May 8, 2014). "$43 million deal to move UW labs for light-rail line". The Seattle Times. Retrieved October 9, 2021.
  89. "Link light rail reaches Seattle's University District, Roosevelt and Northgate neighborhoods" (Press release). Sound Transit. October 1, 2021. Retrieved October 2, 2021.
  90. Lindblom, Mike (June 21, 2022). "Cracked tiles mean light rail in Rainier Valley will run less often this summer". The Seattle Times. Retrieved September 17, 2023.
  91. Lindblom, Mike (May 4, 2023). "How a demolition crew punctured the Westlake Station ceiling". The Seattle Times. Retrieved September 17, 2023.
  92. Blatchford, Taylor (May 7, 2023). "After ceiling puncture, Seattle light rail resuming normal service Monday". The Seattle Times. Retrieved September 17, 2023.
  93. Lindblom, Mike (August 8, 2023). "Severe shutdown ahead for Seattle light rail due to sinking tracks". The Seattle Times. Retrieved September 17, 2023.
  94. Lindblom, Mike (29 de agosto de 2023). "Problemas de señalización retrasan los trenes de Sound Transit durante la hora punta" . The Seattle Times . Consultado el 17 de septiembre de 2023 .
  95. "El servicio de la Línea 1 vuelve a la normalidad el sábado 16 de septiembre" (Comunicado de prensa). Sound Transit. 14 de septiembre de 2023. Consultado el 17 de septiembre de 2023 .
  96. Deshais, Nicholas; Lindblom, Mike (30 de agosto de 2024). "Las nuevas estaciones de tren ligero atraen a grandes multitudes en sus primeros viajes" . The Seattle Times . Consultado el 30 de agosto de 2024 .
  97. 1 2 Lindblom, Mike (6 de agosto de 2024). "Esta estación de tren ligero de Seattle va a cambiar de nombre, aclarando la confusión" . Recuperado el 4 de septiembre de 2024 .
  98. Deshais, Nicholas (6 de diciembre de 2025). "Nuevas estaciones de tren ligero abren con una fiesta en el sur del condado de King" . The Seattle Times . Consultado el 6 de diciembre de 2025 .
  99. Lindblom, Mike (14 de febrero de 2026). "Más trenes ligeros aumentarán la frecuencia y la capacidad de Seattle-Lynnwood" . The Seattle Times . Consultado el 7 de abril de 2026 .
  100. Deshais, Nicholas; Lindblom, Mike; Kroman, David (28 de marzo de 2026). "El tren ligero de Seattle finalmente abre sus puertas al otro lado del lago Washington" . The Seattle Times . Consultado el 7 de abril de 2026 .
  101. 1 2 Shaner, Eliza (20 de marzo de 2026). "Cómo viajar en la Línea 2 como un profesional" . The Platform . Sound Transit . Recuperado el 7 de abril de 2026 .
  102. Lindblom, Mike (8 de marzo de 2024). "Sound Transit hace todo lo posible para solucionar la escasez de trenes en Lynnwood" . The Seattle Times . Consultado el 9 de marzo de 2024 .
  103. 1 2 3 Lindblom, Mike (25 de agosto de 2024). "Se inaugura el tren ligero de Lynnwood. Esto es lo que encontrará en 4 nuevas estaciones" . The Seattle Times . Consultado el 20 de junio de 2025 .
  104. 1 2 3 "Adenda SEPA de 2018 a la Declaración de Impacto Ambiental Final de la Extensión del Enlace de Lynnwood (abril de 2015)" (PDF) . Sound Transit. Mayo de 2018. págs. 2–5 , 34. Recuperado el 7 de septiembre de 2024 . 
  105. Haglund, Noah (23 de abril de 2015). "Sound Transit aprueba la ruta del tren ligero a Lynnwood y Terrace" . The Everett Herald . Consultado el 20 de junio de 2025 .
  106. 1 2 3 "Capítulo 2: Alternativas consideradas" (PDF) . Declaración final de impacto ambiental de la extensión de Lynnwood Link . Sound Transit. Abril de 2015. págs. 3, 15–16 , 20–25 . Recuperado el 20 de junio de 2025 . 
  107. Haglund, Noah (27 de noviembre de 2016). "Este es el plan para el tren ligero a Lynnwood, Mountlake Terrace" . The Everett Herald . Consultado el 20 de junio de 2025 .
  108. Lindblom, Mike (13 de julio de 2022). "Sin planes aún para aumentar el número de pasajeros, Sound Transit apuesta por una estación aislada en el norte de Seattle" . The Seattle Times . Consultado el 20 de junio de 2025 .
  109. Lindblom, Mike (17 de marzo de 2015). "La máquina del túnel de tránsito llega a la luz del día en la estación Roosevelt" . The Seattle Times . Consultado el 2 de octubre de 2021 .
  110. Morgan, Rick (9 de abril de 2021). "Sound Transit fija la fecha de apertura de la extensión del tren ligero de Northgate" . Puget Sound Business Journal . Consultado el 9 de octubre de 2021 .
  111. Enlace de tren ligero a la UW (PDF) (Mapa). The Seattle Times. Mayo de 2011. Archivado (PDF) del original el 13 de agosto de 2011. Consultado el 17 de septiembre de 2017 .
  112. 1 2 3 4 Enlace de tren ligero (Mapa). Cartografía de Bing Maps . Sound Transit. Archivado del original el 18 de septiembre de 2017. Recuperado el 17 de septiembre de 2017 .
  113. Tren ligero University Link (PDF) (Mapa). Sound Transit. Enero de 2007. Archivado del original (PDF) el 10 de septiembre de 2015. Consultado el 17 de septiembre de 2017 .
  114. "Túnel de Pine Street" (PDF) . Sound Transit. 30 de noviembre de 2012. Archivado del original (PDF) el 9 de septiembre de 2015. Consultado el 17 de septiembre de 2017 .
  115. 1 2 Túnel de tránsito del centro de Seattle (PDF) (Mapa). King County Metro . Archivado (PDF) del original el 6 de octubre de 2014. Recuperado el 17 de septiembre de 2017 .
  116. Lindblom, Mike (21 de mayo de 2009). "Doble paso en el túnel: Es posible que los autobuses tarden más en despejar el túnel compartido" . The Seattle Times . pág. A1. Archivado del original el 5 de septiembre de 2017. Recuperado el 17 de septiembre de 2017 . 
  117. Túnel de tránsito: Estación Distrito Internacional/Barrio Chino (PDF) (Mapa). Metro del Condado de King. Octubre de 2015. Archivado (PDF) del original el 23 de noviembre de 2015. Recuperado el 17 de septiembre de 2017 .
  118. 1 2 Nowlin, Mark (12 de julio de 2009). "Tu guía para viajar en tren ligero" (Mapa). The Seattle Times . Archivado del original el 15 de julio de 2009. Recuperado el 17 de septiembre de 2017 .
  119. "Instalaciones de operación y mantenimiento del tren ligero Link" (PDF) . Sound Transit. 30 de noviembre de 2012. Archivado del original (PDF) el 21 de septiembre de 2015. Consultado el 17 de septiembre de 2017 .
  120. "Túnel y estación de Beacon Hill" (PDF) . Sound Transit. 30 de noviembre de 2012. Archivado del original (PDF) el 9 de septiembre de 2015. Consultado el 17 de septiembre de 2017 .
  121. Sistema de transporte público Metro: Área noroeste (PDF) (Mapa). King County Metro. Septiembre de 2016. Archivado del original (PDF) el 2 de enero de 2018. Consultado el 17 de septiembre de 2017 .
  122. Lindblom, Mike (15 de junio de 2009). "La estación de tren ligero de Beacon Hill se llena de arte colorido" . The Seattle Times . pág. A1. Archivado del original el 11 de octubre de 2016. Recuperado el 17 de septiembre de 2017 . 
  123. Lindblom, Mike (22 de junio de 2009). "Rutas de autobús renovadas para transportar a los viajeros a la estación de tren ligero de Mount Baker" . The Seattle Times . pág. B1. Archivado del original el 18 de septiembre de 2017. Recuperado el 17 de septiembre de 2017 . 
  124. 12Lindblom, Mike (July 12, 2009). "All aboard, Seattle: You're a light-rail town now". The Seattle Times. p. A1. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  125. Brown, Charles E. (April 27, 2009). "Some drivers see red over light rail's impact on traffic lights". The Seattle Times. p. B1. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  126. Rainier Valley Link Light Rail Route & Stations(PDF) (Map). Sound Transit. February 2, 2004. OCLC 49259323. Archived from the original(PDF) on February 8, 2006. Retrieved September 17, 2017.
  127. Hubbard, Ian (July 16, 2009). "The long bridge to Tukwila". Seattle Daily Journal of Commerce. Archived from the original on August 14, 2017. Retrieved September 17, 2017.
  128. 1234Lindblom, Mike (November 30, 2025). "Your guide to three new light rail stations in South King County". The Seattle Times. Retrieved December 6, 2025.
  129. 12Sound Transit Agency Safety Plan(PDF) (Report). Sound Transit. September 2024. pp. 43–48. Retrieved September 26, 2024.
  130. Cowan, Nils (October 5, 2016). "Sound Transit 3: Proposition 1 Hopes to Create a Regional Rail Network". KCTS-TV. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  131. 123Central Link Initial Segment and Airport Link Before & After Study: Final Report(PDF) (Report). Sound Transit. February 2014. pp. 6–7. Archived(PDF) from the original on February 23, 2017. Retrieved September 17, 2017 via Washington State Department of Transportation.
  132. Scigliano, Eric (26 de octubre de 2016). "El barrio del sur de Seattle que Sound Transit olvidó" . Seattle Weekly . Archivado del original el 18 de septiembre de 2017. Recuperado el 17 de septiembre de 2017 .
  133. 1 2 3 "Plan de desarrollo del transporte público 2025–2030" (PDF) . Sound Transit. Agosto de 2025. págs. 8, 10. Consultado el 11 de agosto de 2025 . 
  134. 1 2 "Estaciones de tren ligero de enlace" . Sound Transit . Consultado el 20 de junio de 2025 .
  135. Gallagher, John (24 de junio de 2019). "Actualizaciones de información en tiempo real llegarán a las estaciones del tren ligero Link" . The Platform . Sound Transit . Consultado el 27 de junio de 2019 .
  136. Green, Sara Jean (15 de julio de 2009). "Sound Transit refuerza la seguridad del tren ligero con luces, cámaras y agentes" . The Seattle Times . pág. A1. Archivado del original el 5 de marzo de 2018. Consultado el 4 de marzo de 2018 . 
  137. "Cómo afrontar las interrupciones del servicio" . Sound Transit . Consultado el 30 de septiembre de 2024 .
  138. "El nuevo servicio de transporte a demanda hace que usar el transporte público en el sureste de Seattle y Tukwila sea más conveniente que nunca" (Comunicado de prensa). King County Metro. 16 de abril de 2019. Consultado el 21 de abril de 2019 .
  139. Lindblom, Mike (5 de julio de 2023). "Tu guía para moverte por Seattle durante la Semana de las Estrellas en autobús, tren, coche, barco y más" . The Seattle Times . Consultado el 5 de julio de 2023 .
  140. "Se inaugura el tren ligero a Lynnwood" (Comunicado de prensa). Sound Transit. 30 de agosto de 2024. Consultado el 30 de agosto de 2024 .
  141. Krishnan, Sonia (16 de julio de 2009). «Los posibles usuarios del tren ligero se quejan de la falta de aparcamiento» . The Seattle Times . pág. A1. Archivado del original el 18 de septiembre de 2017. Consultado el 17 de septiembre de 2017 . 
  142. Chen, Natasha (29 de marzo de 2016). "Los problemas de estacionamiento se intensifican alrededor de las estaciones del tren ligero a medida que más pasajeros suben" . KIRO 7 News . Archivado del original el 18 de septiembre de 2017. Recuperado el 17 de septiembre de 2017 .
  143. 1234"1 Line schedule: Lynnwood City Center – Federal Way Downtown"(PDF). Sound Transit. December 2025. Retrieved December 6, 2025.
  144. 1234567"Parking garages and lots". Sound Transit. Retrieved August 11, 2025.
  145. Viriyincy, Oran (2013). "Chapter 3: Seattle Bus Tunnel". Back To The Future: A History of Transit Planning in the Puget Sound Region. Seattle: University of Washington College of Built Environments. p. 48. ISBN 978-1304103390. OCLC 961186618. Archived from the original on January 19, 2018. Retrieved September 17, 2017 via Google Books.
  146. "Chapter 4: Financial Analysis". Central Link Light Rail Transit Project: Initial Segment Environmental Assessment. Sound Transit. February 2002. p. 45. OCLC 48937173. Archived from the original on January 19, 2018. Retrieved September 17, 2017 via Google Books.
  147. Lindblom, Mike (November 14, 2009). "Light rail to airport to begin Dec. 19". The Seattle Times. p. A1. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  148. "Proposed Service Change: Downtown Seattle – Sea-Tac International Airport". King County Metro. January 10, 2009. Archived from the original on May 11, 2009. Retrieved September 17, 2017.
  149. Alquist, Nic (March 8, 2024). "Late night 1 Line service to see changes starting March 30". The Platform. Sound Transit. Retrieved May 3, 2024.
  150. Deshais, Nicholas (March 27, 2026). "How Seattle light rail crossing Lake Washington will change bus service". The Seattle Times. Retrieved April 4, 2026.
  151. Cuplin, Norizumi (March 9, 2026). "Around-the-clock airport access: Night Bus pilot coming March 28". The Platform. Sound Transit. Retrieved April 4, 2026.
  152. "Quarterly Ridership Report". Sound Transit. Archived from the original on March 18, 2017. Retrieved March 6, 2017.
  153. "Transit technology works for you". Sound Transit. February 10, 2015. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  154. Transit Development Plan 2010–2015 and 2009 Annual Report(PDF) (Report). Sound Transit. March 18, 2010. p. 16. Archived from the original(PDF) on September 18, 2017. Retrieved September 17, 2017.
  155. Lindblom, Mike (March 3, 2011). "Sound Transit ridership falls short of its goals". The Seattle Times. p. B1. Archived from the original on August 25, 2016. Retrieved August 25, 2016.
  156. "Fourth Quarter 2012 Service Delivery Quarterly Performance Report"(PDF). Sound Transit. 2013. Archived(PDF) from the original on March 13, 2016. Retrieved September 17, 2017.
  157. "Fourth Quarter 2014 Service Delivery Quarterly Performance Report"(PDF). Sound Transit. February 26, 2015. Archived(PDF) from the original on March 13, 2016. Retrieved September 17, 2017.
  158. "Fourth Quarter 2015 Service Delivery Quarterly Performance Report"(PDF). Sound Transit. February 25, 2016. Archived(PDF) from the original on April 18, 2016. Retrieved September 17, 2017.
  159. 12"University Link ridership sprints out of the starting gates". Sound Transit. April 20, 2016. Archived from the original on August 25, 2016. Retrieved August 25, 2016.
  160. "Fourth Quarter 2016 Service Delivery Quarterly Performance Report"(PDF). Sound Transit. February 17, 2017. Archived from the original(PDF) on February 18, 2017. Retrieved September 17, 2017.
  161. «Nuevos usuarios del tren ligero impulsan un número récord de pasajeros en el segundo trimestre» (Comunicado de prensa). Sound Transit. 25 de agosto de 2016. Archivado del original el 25 de agosto de 2016. Consultado el 25 de agosto de 2016 .
  162. Lindblom, Mike (7 de octubre de 2016). "El partido entre la UW y Stanford ayuda a batir el récord del tren ligero de más de 100 000 pasajeros" . The Seattle Times . pág. B1. Archivado del original el 7 de octubre de 2016. Consultado el 6 de octubre de 2016 . 
  163. "Informe trimestral sobre el desempeño en la prestación de servicios del cuarto trimestre de 2020" (PDF) . Sound Transit. 25 de febrero de 2021. Consultado el 4 de marzo de 2021 .
  164. Kroman, David (1 de enero de 2023). "El futuro de los trenes Sounder está en el limbo mientras los pasajeros tardan en regresar" . The Seattle Times . Consultado el 11 de agosto de 2023 .
  165. Lindblom, Mike (11 de agosto de 2023). "El tren ligero de Seattle establece récords de pasajeros en medio de grandes eventos y juegos" . The Seattle Times . Consultado el 11 de agosto de 2023 .
  166. Lindblom, Mike (8 de noviembre de 2024). "Cinco estaciones del tren ligero de Seattle cerrarán este fin de semana" . The Seattle Times . Consultado el 9 de noviembre de 2024 .
  167. Lindblom, Mike; Deshais, Nicholas (12 de febrero de 2026). "El tren ligero transportó a más de 200 000 pasajeros el día del desfile de los Seahawks en el Super Bowl" . The Seattle Times . Consultado el 12 de febrero de 2026 .
  168. "Máquinas expendedoras de billetes" (PDF) . Sound Transit. 23 de junio de 2017. Archivado (PDF) del original el 6 de julio de 2017. Consultado el 17 de septiembre de 2017 .
  169. "Boleto de transporte GO" . Metro del Condado de King. Archivado del original el 18 de septiembre de 2017. Consultado el 17 de septiembre de 2017 .
  170. Yoon-Hendricks, Alexandra (22 de febrero de 2026). "El sistema de pago sin contacto con tarjeta de crédito comienza el lunes en el transporte público ORCA del área de Seattle" . The Seattle Times . Consultado el 24 de febrero de 2026 .
  171. Gray, Bruce (November 14, 2017). "Why doesn't Link light rail use turnstiles?". The Platform. Sound Transit. Archived from the original on February 22, 2018. Retrieved February 21, 2018.
  172. Kroman, David (January 27, 2022). "Sound Transit fares on 'unsustainable' trajectory, CEO warns". The Seattle Times. Retrieved January 29, 2022.
  173. Lindblom, Mike (July 8, 2014). "Shooting brings attention to light rail's fare inspection force". The Seattle Times. p. A1. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  174. Lindblom, Mike (August 12, 2009). "Link's ticket system confounds light-rail riders". The Seattle Times. p. A1. Archived from the original on February 22, 2018. Retrieved February 21, 2018.
  175. Kroman, David (April 28, 2022). "Sound Transit eases fare enforcement amid equity concerns". The Seattle Times. Retrieved September 17, 2022.
  176. Lindblom, Mike (September 2, 2022). "Sound Transit goes all-in on a gentler kind of fare enforcement". The Seattle Times. Retrieved September 17, 2022.
  177. Lindblom, Mike (August 30, 2024). "Light rail to Lynnwood starts today; so do flat fares, systemwide". The Seattle Times. Retrieved August 30, 2024.
  178. Lindblom, Mike (December 15, 2023). "Sound Transit light rail to cost $3 a ride — for trips near or far". The Seattle Times. Retrieved August 30, 2024.
  179. Johnson, Matthew (September 24, 2015). "Q: Why do I need to tap on and tap off my ORCA card?". Sound Transit. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  180. "How to pay". Sound Transit. Retrieved October 31, 2022.
  181. "ORCA Lift". King County Metro. Archived from the original on September 30, 2017. Retrieved September 17, 2017.
  182. Lee, Jessica (May 22, 2017). "From ORCA cards to bus-driver behavior: questions and answers". The Seattle Times. p. B1. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  183. Kroman, David (September 1, 2022). "Free transit starts today for most youths across WA". The Seattle Times. Retrieved October 31, 2022.
  184. 12Pryne, Eric (November 25, 2003). "Sound Transit picks Japanese firm to build train cars for light-rail line". The Seattle Times. p. B3. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  185. 12Lindblom, Mike (August 8, 2016). "Sound Transit keeping close eye on crowded light-rail trains". The Seattle Times. p. A7. Archived from the original on September 18, 2017. Retrieved September 17, 2017.
  186. 12"Technical Data: Seattle, WA – Sound Transit"(PDF). Kinkisharyo International. August 2015. Archived(PDF) from the original on September 6, 2017. Retrieved September 17, 2017.
  187. 123Central Link Operations Plan – Westlake to SeaTac/Airport(PDF) (Report). Sound Transit. July 29, 2008. pp. 18–21. Archived(PDF) from the original on September 24, 2015. Retrieved September 17, 2017.
  188. "Bicycle Riders Guide"(PDF). Sound Transit. June 2017. Archived(PDF) from the original on September 18, 2017. Retrieved September 17, 2017.
  189. Lindblom, Mike (August 29, 2024). "Light rail for beginners: How to ride the new Lynnwood extension". The Seattle Times. Retrieved September 26, 2024.
  190. "Se proponen cuatro nuevos vagones de tren ligero para la extensión del enlace con el aeropuerto de Sound Transit" (Comunicado de prensa). Sound Transit. 20 de octubre de 2005. Archivado del original el 16 de agosto de 2016. Consultado el 9 de agosto de 2016 .
  191. "El tren ligero" (PDF) . The Seattle Times. 10 de julio de 2009. Archivado (PDF) del original el 26 de agosto de 2017. Consultado el 17 de septiembre de 2017 .
  192. Lindblom, Mike (27 de mayo de 2015). "El estado finalmente obtiene controles de trenes basados ​​en satélites, 20 años después del accidente fatal" . The Seattle Times . Consultado el 30 de enero de 2019 .
  193. Middleton, William D. (1 de abril de 2006). "Sound Transit se prepara para el tren ligero: el crecimiento proyectado en los próximos 25 años impulsa el rápido impulso de la región de Seattle para expandir el tren ligero" . Railway Age . Chicago, Illinois: Simmons-Boardman Publishing : 43–45 . ISSN 0033-8826 . OCLC 1586268. Archivado del original el 2 de mayo de 2006. Recuperado el 17 de septiembre de 2017 .  
  194. "Sound Transit Motion No. M2005-117" (PDF) . Sound Transit. 8 de diciembre de 2005. Archivado del original (PDF) el 18 de septiembre de 2017. Consultado el 17 de septiembre de 2017 .
  195. Velush, Lukas (22 de mayo de 2007). "Vagones terminados en Everett" . The Everett Herald . Archivado del original el 24 de mayo de 2007. Consultado el 17 de septiembre de 2017 .
  196. 1 2 "Sound Transit Motion No. M2014-105" (PDF) . Sound Transit. 18 de diciembre de 2014. Archivado del original (PDF) el 18 de septiembre de 2017. Recuperado el 17 de septiembre de 2017 .
  197. "Sound Transit presenta el primer vehículo de tren ligero Central Link" (Comunicado de prensa). Sound Transit. 17 de diciembre de 2006. Archivado del original el 18 de septiembre de 2017. Consultado el 17 de septiembre de 2017 .
  198. Enlace Instalación satélite de operaciones y mantenimiento: Revisión del plan del sistema de tren ligero principal (PDF) (Informe). Sound Transit. Septiembre de 2012. pág. 1. Archivado (PDF) del original el 10 de septiembre de 2015. Recuperado el 17 de septiembre de 2017 . 
  199. «ST inaugura una moderna instalación de operaciones y mantenimiento del tren ligero Link» (Comunicado de prensa). Sound Transit. 4 de marzo de 2007. Archivado del original el 18 de septiembre de 2017. Consultado el 17 de septiembre de 2017 .
  200. Cohen, Aubrey (16 de junio de 2009). "Aquí es donde arreglan los trenes ligeros" . Seattle Post-Intelligencer . Consultado el 28 de febrero de 2020 .
  201. "Presupuesto propuesto para 2017" (PDF) . Sound Transit. Septiembre de 2016. pág. 32. Archivado del original (PDF) el 18 de septiembre de 2017. Consultado el 17 de septiembre de 2017 . 
  202. "King County Metro y Sound Transit llegan a un acuerdo para continuar con las operaciones y el mantenimiento integrados del ferrocarril hasta 2023" (Comunicado de prensa). Oficina del Ejecutivo del Condado de King. 29 de abril de 2019. Consultado el 25 de abril de 2022 .
  203. "Siemens cambia la marca de tranvías de piso bajo norteamericanos". Tramways & Urban Transit . N.° 993. Reino Unido: Mainspring Enterprises Ltd. Septiembre de 2020. pág. 336. ISSN 1460-8324 .   
  204. Demay, Daniel (22 de septiembre de 2016). "Sound Transit realiza un pedido de 554 millones de dólares para más vagones de tren ligero" . Seattle Post-Intelligencer . Archivado del original el 30 de septiembre de 2016. Consultado el 29 de septiembre de 2016 .
  205. "Sound Transit encargará 30 vehículos adicionales de tren ligero" (Comunicado de prensa). Sound Transit. 27 de abril de 2017. Archivado del original el 16 de julio de 2017. Consultado el 16 de julio de 2017 .
  206. Lindblom, Mike (19 de junio de 2019). "Sound Transit muestra sus nuevos vagones de tren ligero, más espaciosos. Entrarán en servicio el próximo año" . The Seattle Times . Consultado el 19 de junio de 2019 .
  207. "Las pruebas de los nuevos vehículos de tren ligero de Link durante el horario de servicio comienzan el 19 de diciembre" (Comunicado de prensa). Sound Transit. 18 de diciembre de 2020. Consultado el 2 de febrero de 2021 .
  208. "Sound Transit completa la nueva base del tren ligero en Bellevue" (Comunicado de prensa). Sound Transit. 20 de mayo de 2021. Consultado el 23 de mayo de 2023 .
  209. Wanek-Libman, Mischa (17 de mayo de 2021). "Sound Transit pone en servicio los primeros vehículos de tren ligero de la Serie 2" . Mass Transit Magazine . Consultado el 23 de mayo de 2023 .
  210. Lindblom, Mike; Baruchman, Michelle (15 de agosto de 2021). "Sound Transit enfrenta un déficit de 6.500 millones de dólares. Esto es lo que podría hacer" . The Seattle Times . Consultado el 23 de mayo de 2023 .
  211. "Borrador del Plan de Implementación del Servicio 2018" (PDF) . Sound Transit. Octubre de 2017. págs. 54–55 . Archivado (PDF) del original el 19 de enero de 2018. Recuperado el 28 de octubre de 2017 . 
  212. 1 2 Servicio futuro de Sound Transit (PDF) (Mapa). Sound Transit. Marzo de 2022. Consultado el 23 de mayo de 2023 .
  213. "Extensiones de West Seattle y Ballard Link: Descripción general del proyecto" (PDF) . Sound Transit. Septiembre de 2017. Archivado del original (PDF) el 17 de septiembre de 2017. Consultado el 17 de septiembre de 2017 .
  214. "Sound Transit da un paso adelante con el inicio de importantes inversiones en infraestructura" (Comunicado de prensa). Sound Transit. 27 de abril de 2017. Archivado del original el 18 de septiembre de 2017. Consultado el 17 de septiembre de 2017 .
  215. Lindblom, Mike (5 de agosto de 2021). "Dos estaciones de tren ligero en Seattle se salvan de los recortes presupuestarios del ST3, la mayoría de los demás proyectos se retrasan" . The Seattle Times . Consultado el 13 de agosto de 2021 .
  216. "Operaciones del sistema LRT y supuestos de OMF" (PDF) . Sound Transit. 7 de abril de 2016. Archivado (PDF) del original el 11 de febrero de 2017. Recuperado el 17 de septiembre de 2017 a través del Departamento de Transporte del Estado de Washington.
  217. Lindblom, Mike (14 de noviembre de 2016). "Dónde los proyectos de Sound Transit 3 podrían acelerarse o ralentizarse" . The Seattle Times . pág. B1. Archivado del original el 28 de agosto de 2017. Recuperado el 17 de septiembre de 2017 . 